Monthly Archives: September 2011

Day 63: New Nose Skin Number 1 (1h 30m)

September 24, 2011

Today I drilled holes in the first nose skin to match the existing ones in the spar and ribs. I deburred the holes and then drew a line 10mm from the edge of the holes and used the snips to trim the extra metal away. This left a very jagged uneven looking cut which...

Read more »

Day 62: Removing Elevator Nose Skins (1hr 15m)

September 5, 2011

Nothing to say here really other than I am getting quite good at taking out rivets. Knock out the core with a punch, drill out the head, rinse and repeat. Nose skins are removed, new ones are here, will see about putting them on over the next few weeks.

Read more »

Day 61: Complete Flaperons Repairs (2 hr)

September 4, 2011
Day 61: Complete Flaperons Repairs (2 hr)

During the week, a new box arrived from Zenith: This box contained my replacement nose skins for the horizontal tail: And some 3-way LED lights for the wing tips. These lights can do the strobes, the nav lights, and position lights all in one unit. And I was surprised how small they were. The...

Read more »