Day 44: Hinge Pins and Tip Ribs (1hr 15m)

April 30, 2011
Day 44: Hinge Pins and Tip Ribs (1hr 15m)

The Tip Ribs have a hinge pin installed on their outside face and a bent strip is installed between the rib and the spar for extra strength. The first task is to drill out and assemble the bent strips to the tip rib, starting with marking the location of the rivet holes. I drilled...

Read more »

Day 43: Elevator Day One (1hr 30m)

April 23, 2011
Day 43: Elevator Day One (1hr 30m)

Constructing the elevator is the usual assemble, deburr, rivet procedure with the extra twists of building an electric trim on the elevator and installing a servo mechanism. Onward then….. First task of the day was to identify all the parts and mark their top sides and locations. In most cases this is easy: the...

Read more »

Day 42: Stabiliser Complete (45m)

April 17, 2011
Day 42: Stabiliser Complete (45m)

All that remained at this point was to fold the top skin over and rivet into the pre-drilled holes. I used the ratchet straps again to bring the skin over so that it wouldn’t bend or crease and cleco’d the skin in place starting at the back and working forwards. Here’s a picture of...

Read more »

Day 41: Stabiliser Bottom Skin (1h 40m)

April 16, 2011
Day 41: Stabiliser Bottom Skin (1h 40m)

The stabiliser assembly had been teasing me for a couple of weeks sat on the bench waiting for the skin but a couple of busy weekends left me unable or unwilling to get into the garage. We start with the bottom skin this time because of the protrusions that would make us unable to...

Read more »

Day 40: Rear Bracket Hinge Fix (20m)

April 10, 2011
Day 40: Rear Bracket Hinge Fix (20m)

This weekend saw us attend two weddings so there wasn’t really any opportunity to work on the plane until the Sunday and then let’s just say I wasn’t in the best physical shape to be working with power tools. I did fix a problem with a previous step. As you can maybe see in...

Read more »

Day 39: Riveting the Stabilizer Skeleton (3h 30m)

April 3, 2011
Day 39: Riveting the Stabilizer Skeleton (3h 30m)

Having deburred the holes yesterday, the first task was to prime the areas where metal touches metal. Used a lot of primer, here. It took a while to put things back together, starting with just the front spar, attaching the doublers and the ribs. Once clecoed in place I riveted everything with A4 rivets...

Read more »

Day 38: Horizontal Stabilizer Deburring (2 hr 30m)

April 2, 2011
stol750-air.jpg

Two and a half hours of filing and deburring, no way to make that sound sexy or fun. Can’t wait to do the wings!

Read more »