Monthly Archives: July 2010

Day 3: Rudder Skeleton Deburring (20m)

July 23, 2010

Left work early today to get ready for my trip to the UK tomorrow. Got home, saw the pieces on the bench and couldn't resist doing a little deburring. I tried using a flat file but didn't seem to be doing too well so switched to a large drill bit instead - a quarter...

Read more »

Day 2: Rudder: Skeleton Assembly (2h 30m)

July 18, 2010
Day 2: Rudder: Skeleton Assembly (2h 30m)

Day 2: Attach rudder horn to bottom rib; drill and cleco bottom rib to spar; installed rear ribs 2, 3, 4, and the nose rib; drilled bent stip and attached it and the tip rib to the spar. Rudder skeleton fully assembled. 2h 30m

Read more »

Day 1: Rudder: Inventory and First Steps (1h 30m)

July 17, 2010
Rudder Inventory

Day 1: Bench building; parts inventory; edge deburring; cut spar doublers to size; drill and cleco doublers to spar. 1h 30m

Read more »

Rudder on the Way

July 6, 2010
stol750-air.jpg

The rudder is on it's way! Estimated delivery is July 12. Got a lot of prep work to do in the garage before we can get started.

Read more »