Some wiring

Finally got round to doing some wiring. I’ve been putting a few cables on the power switches for those items that are mounted in the panel. For others I think I will wait until the panel is in the plane…

6 Year Anniversary

Today marks the 6th anniversary of making the first hole in the rudder which started this crazy project. Much like with Trump’s campaign, surely someone should have stopped it before it got this far?? My build log shows 499 hours…

Wiring 101

While it is too hot to work in the hangar, I’ve been playing with my panel install with the aim of identifying all the wires I need to buy and where to run them. It is a low rush job…

Slat Wrap (Pilot Side)

Over this weekend I’ve managed to sneak a few early hours in the morning before the temperatures got too crazy and, more importantly, the humidity of last weekend was gone. I tried two weekends ago and only lasted 30 minutes…

Slats Trial Fit

I’ve missed the last two weekends away and I’m about to be sent back to Tokyo (hurrah!) this weekend but I did steal an hour in the hangar to mess with the slats. I have to say it was great…

Wings Install

Today was the last day that I could have Allen’s help before the heat goes away in October and it was very important to all of us (Scott came along too) to get the wings back on. To get to…